Ford BlueOval Battery Park

With Walbridge · Marshall, Michigan

Material recovery that delivers measurable value on a complex industrial build.

9,000tons diverted from landfill

Wood recovered
8,000 tons
Other materials diverted
1,000 tons

Each block represents approximately 100 tons. Other materials include cardboard, plastic, and metal.

38%lower client cost

Cost index, with the prior baseline set to 100. A 38% reduction means a cost index of 62 with Woodchuck.

$1.8Min client savings
Reported project results · May 2026See the sources and calculation
On the ground

Less disposal cost.
More recovery. A record of the result.

Crates, dunnage, shipping pallets, and custom rigging arrived in changing sizes and volumes at Ford’s EV battery plant construction project. Working with Walbridge, Woodchuck brought material recovery and tracking into the site’s day-to-day operations.

Read the project announcement

Plan around the actual waste stream.

Visibility into container levels and the contents of each load helped the team adapt as material volumes changed.

Recover across materials.

Wood, cardboard, plastic, and metal were tracked as part of one coordinated waste-diversion program.

Make the results reportable.

Load-level data connected recovery work with documentation of material destinations and intended use.

Recovery you can follow.

Physical operations move the material. ChuckTrace™ connects the evidence, from the job site to the next use.

  1. 01 / On site

    Identify & separate

    Understand what is in the waste stream and organize materials for recovery.

  2. 02 / Recovery

    Collect & route

    Coordinate loads and direct usable materials toward a productive next use.

  3. 03 / Proof

    Track & report

    Connect site records, weight tickets, and receiving information into a traceable record.

Ross Linton, Group Vice President at Walbridge
“In just a few short months, they've helped us transform our waste process to one that's measurable, trackable, and easily managed.”
Ross LintonGroup Vice President, WalbridgeRead the Walbridge perspective

Put the Woodchuck effect to work.

Tell us what makes waste difficult on your next project. We’ll discuss how coordinated operations, recovery and reporting could improve the outcome.

Discuss your project

Project figures & sources

Figures are Woodchuck-reported project results from its May 2026 Final Project Sustainability Report, cited on page 9 of its August 2026 public filing. Totals and savings are approximate. The 1,000-ton other-material figure is the difference between 9,000 tons diverted and 8,000 tons of wood recovered. The cost comparison is normalized from the reported 38% client-cost reduction.